Florida Phenolic Duct Construction Code 2015

Adoption Info of Florida Phenolic Duct Construction Code 2015

Official title 2015 Florida Phenolic Duct Construction Code

Effective dates January 1, 2015 – December 31, 2019

Published by Florida Department of Business and Professional Regulation (DBPR)
Read More: Florida Metal and Flexible Duct Code 2020

Florida Emergency Eyewash and Shower Equipment Code 2009

Overview The 2015 Florida Phenolic Duct Construction Code provides detailed guidelines for the design, fabrication, installation, and maintenance of phenolic duct systems used in heating, ventilation, and air conditioning (HVAC) applications. Phenolic ducts, known for their lightweight, fire-resistant, and energy-efficient properties, are commonly used in commercial and industrial settings. This code includes specifications for material quality, duct construction methods, insulation, sealing, and support to ensure the optimal performance and durability of phenolic duct systems.

The 2015 edition aligns with industry standards such as those from the Sheet Metal and Air Conditioning Contractors’ National Association (SMACNA) and the American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE), and it incorporates Florida-specific amendments to address the state’s unique environmental conditions and regulatory requirements.